Project Description
The main objective of the project is to carry the pressurized sewerage water from main sewage pump station PS#8 in Khan Younis City to Emergency ponds at Rafah to Sofa cross check This project includes the following components:
- Supply and installation of 28" of fiber glass pipes of total length 4000m.
- Civil works (Pre caste Concrete manholes and cast in situ concert manholes).
- Supply and install the Manifold for existing pumps at PS#8.