The works include supplying and laying 3000m of 24" welded steel and fiber pipes internally coated with high alumina cement with all needed valves and accessories from Gaza Central Waste Water Treatment Plant to Sea shore out fall Location at Al-Sheikh Ejleen-Gaza.