1. Supply and installPVC-U sewage pipes of various diameters ranging from 160mm to 630mm totallength around 23,000 ml.
2. Rehabilitationworks in El Berka PS including:
A. Refurbishmentfor all existing facilities at the pumping station
B. Main powerconnection.
3. Supply andinstall sewage pump in Al-Bassa with required electro-mechanical equipment.